Feed processing method of feed machinery and machine structure

Production TuSiLiao need those machines, according to the size of different yield of different is that some of the differences. But it is not a great difference. In general machine has used in the production TuSiLiao: crusher, feed pellet machine, feed mixer, this a few is imperative. There could be other equipment, screening equipment, cooling equipment, all kinds of auxiliary equipment, shaq dragon, blower, belt machine, packaging machine, boiler, etc. 1、Base: play the role of the connecting parts and bearing mill, make them form a whole. Shredded material is being exhausted from the base. 2、Rotor: the main shaft, hammer frame plate, pin shaft, bearings and other parts, hammer, is the main moving parts of crusher. Rotor speed is higher, assembled on without pin and hammer into the dynamic balance test. 3、Operate the door: replace the sieve plate or hammer to open door operation. Crusher work by locks lock door operation, ensure the operation of rotor rotating door can't open on its own. 4、On the chassis: upper feeding mouth, lower connection with base, sieve plate on both sides respectively equipped, and the rotor of the crushing chamber, the material in crushing chamber to smash. 5、Feeding guide mechanism: make the material from the left or right into the crushing chamber. Feeding guide plate of the reversing manual control to ensure the feed direction consistent with the rotor turning. 6、Fixed in powder pressure screen structure: the locking device connected, ensure that screen surface inside the mill. 7、Sieve sieve beam: sieve beam and pressure institutions together to screen piece fixed on the shredder. Production of feed mill adopts double rotor structure, greatly improve the working efficiency.

09

2016

/

09

Proper use of feed mill

Proper use of feed mill 1、Mill operation for a long time, should be fixed on the basis of cement. If change often work site, grinder with the motor installed on the made of Angle iron frame, if mill diesel power, should make the two power match, namely power slightly bigger than the mill power of diesel engine, and make the pulley groove of the two is consistent, pulley end on the same plane. 2、Mill after installation to check each fastener tighten situation, if there is loose should be tightened. 3、To check whether the belt elasticity is appropriate, whether the motor shaft and crusher shaft parallel. 4、Before starting the grinder, rotating the rotor by hand, and check the tooth claw hammer, and rotor operation is flexible and reliable, and there are no collisions in the shell, rotor rotate to whether in direction arrow on board, motor and shatter machine lubrication are in good condition. 5、Don't change the pulley, in case of high speed crushing chamber to produce explosion, or low speed impact work efficiency. 6、Crushing machine idle first 2 a 3 minutes after launch, no anomalies feeding again after work. 7、Work should pay attention to the workings of the crusher of at any time, feeding wants even, in case of blocking stuffy car, don't long time overload running. If find any vibration, noise, bearing and the body temperature is too high, the phenomenon such as outward spraying material, should immediately stop check, troubleshooting rear can continue to work. 8、Crushing material should be checked carefully to avoid copper, iron, stone and other hard objects into the crushing chamber cause an accident. 9、Operators don't wear gloves, feeding should be standing on the mill profile, in case the rebound sundry injured facial. 10、Jams, forbidden hand pulled the feed, forced feeding or stick.

09

2016

/

09